These 13 stages describe a typical custom gunite pool project. Some work may overlap or follow a different sequence as the design, site conditions, engineering, permits, and inspections require. Your project plan will define the scope and schedule.
PHASE ONE · DISCOVER & DESIGN
Make the vision yours.
Work through the layout and selections before the backyard becomes a construction site.
Pool design and material selections
STEP 01
Free Consultation
We come to your property for a free consultation to take measurements, walk the site, and discuss your ideas. Together, we explore the pool’s layout and placement, review access, and consider how the pool, spa, and outdoor living areas will fit your backyard.
STEP 02
See the design in 3D.
Explore how the proposed water, spa, and gathering areas fit together. Refine the layout, then coordinate the drawings, engineering, and approvals needed to move toward construction.
STEP 03
Choose the look and feel.
Compare waterline tile, coping, interior finishes, and deck materials as one palette. Review the appearance, texture, care needs, and agreed allowances before finalizing selections.
PHASE TWO · PREPARE & BUILD
Watch the plan take shape.
Structure and pool systems come first. The visible finishes follow as the build progresses.
Pool concept plan
STEP 04
Mark the pool on site.
Transfer the approved plan to the ground. Review its position, shape, and connection to the house before excavation; changes at this point may require revised plans or approvals.
STEP 05
Excavate the pool area.
Remove earth to establish the pool’s footprint and depths. Access, rock, soil, and other conditions discovered on site can influence the work and need review as excavation proceeds.
STEP 06
Build the reinforced framework.
Install forms and reinforcing steel according to the engineered design. This framework establishes the structure that will support the pool shell, including the planned steps, benches, and spa.
STEP 07
Connect the pool systems.
Coordinate plumbing and electrical work for circulation, lighting, controls, and selected features. Testing and required inspections are part of preparing these systems for the next construction stages.
STEP 08
Create the concrete shell.
Apply and shape the concrete around the reinforcement to form the pool’s walls and floor. Follow the project’s curing requirements before the later finish work proceeds.
STEP 09
Define the waterline and rim.
Install the selected waterline tile and coping. These details define the transition between water and deck and bring the chosen color and material palette into view.
STEP 10
Add stonework and custom details.
Build the masonry elements included in the design, such as raised spa walls or feature walls. Coordinate their proportions, stone finishes, and connections with the surrounding pool.
STEP 11
Create the spaces around the water.
Complete the planned decking and coordinate included outdoor living elements. Give attention to paths, surface transitions, and drainage so the surrounding spaces support the finished layout.
STEP 12
Finish the interior and begin filling.
Apply the specified interior surface, then coordinate the initial fill and startup care. The selected finish manufacturer’s instructions guide the timing, water care, and brushing requirements.
PHASE THREE · START UP & SETTLE IN
Get ready to enjoy it.
The last stage is about understanding your pool, as well as enjoying the view.
Pool, spa, and outdoor living inspiration
STEP 13
Start up, learn, and settle in.
Review equipment operation, controls, water care, and the responsibilities of pool ownership. Keep the project documents, applicable warranties, and finish-care instructions together, and confirm when the pool is ready for swimming.